Dry Riser Systems that quench a potential disaster
Installation

Once we have been awarded your project, we will start to work on the design and manufacture stage.

All projects we undertake are measured and fabricated on site to ensure the exact requirements for each installation are accurately met and any unforeseen alterations can be easily implemented.


You can feel safe in the knowledge that all installation work is carried out by our fully-qualified Engineers. All our site personnel are accredited to the Construction Skills Certification Scheme, which includes training and instruction in advanced and basic site skills. It also encompasses Health and Safety awareness as detailed within the CSCS Scheme Booklet.


Safety is of paramount concern to us, which is why all our Engineers are qualified installers of Fixed Fire and Suppression Systems. All our Engineers also hold PASMA and IPAF cards should they be required.


It's good to know that we can handle your project, whichever part of the country you are located in. We have teams of qualified engineers strategically located across the UK to serve the demands of any project within the British Isles.


Finally, all installation work carried out by our Engineers come with a 12-month warranty.

Pre-start Site Requirements

Cabinet Heights
A hole should be formed ideally between 400mm – 600mm from finished floor level to the base of the cabinet.


Core Drilling
All holes should be core drilled 150mm O/D a minimum of 50mm away from any wall. This is to ensure there is sufficient clearance for couplings & brackets etc.


Standard Fitting
From the back of the pipe to the front of the valve is approximatley 450mm using standard flanged valves. This can be reduced to approximatley 350mm if Right Angles Valves are used.